[1]
“Analyzing Feedback M/G/1 Double Retrial Orbit with Two-Phase Optional Service and Repair under Working Vacation Policy”, Contemp. Math., vol. 5, no. 4, pp. 5795–5827, Dec. 2024, doi: 10.37256/cm.5420245813.